ms·1993년 5월 1일
Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
Chung‐Yee Lee, T.C.E. Cheng, Bertrand M.T. Lin
인용
297
피인용
5.0
FWCI
1
IS/마케팅/OM 탑저널 피인용
19
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
This paper considers minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. After problem formulation, we present a proof to show that the general version of this problem is strongly NP-complete. We then discuss a few polynomially solvable cases of the problem and present the solution algorithms. Next, a branch and bound solution scheme is suggested. Finally, three heuristics to find approximate solutions to the general problem are proposed and their error bounds are analyzed.
02연구 흐름
불러오는 중…
03비슷한 논문
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Sequencing Two-Machine Flow-Shops with Finite Intermediate Storage
- An Algorithm for Solving the Job-Shop Problem
- Minimising the Maximum Penalty in the Two-Machine Flow Shop
- Scheduling Jobs on Two Facilities to Minimize Makespan
- A Fast Taboo Search Algorithm for the Job Shop Problem
- Focused Scheduling in Proportionate Flowshops
- Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times
- Minimizing Variation of Flow Time in Single Machine Systems
04이후 연구
05선행 연구
15 / 19편
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Flowshop Sequencing Problem with Ordered Processing Time Matrices
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 39(5) · 616–625
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.39.5.616
- 저자Chung‐Yee Lee, T.C.E. Cheng, Bertrand M.T. Lin