We consider the problem of minimizing renewable resource availability costs in an activity-on-the-node project network subject to a project due date. Project activities have fixed durations and may require the use of multiple renewable resources in constant amounts throughout their duration. Various assumptions may be made about the type of precedence relations, ready times, due dates, and task interruptability. Given a discrete, non-decreasing cost function of the constant resource availability for every resource type, the objective is to determine the resource availability levels in order to minimize the sum of the availability costs over all resource types. An effective optimal algorithm is described and extensive computational experience is reported.
불러오는 중…
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A Branch and Bound Algorithm for Minimizing Cost in Project Scheduling
- Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions
- Scheduling of Project Networks by Job Assignment
- Project Scheduling Under Partially Renewable Resource Constraints
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 41(10) · 1590–1598
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.41.10.1590
- 저자Erik L. Demeulemeester