- 주제작업장 일정 최적화 · 생산·최적화
In most PERT scheduling problems, uncertainties in job duration are handeled by a “wait-and-see” formulation in which it is assumed that the samples of job duration are known at the moment of scheduling; much attention has been devoted to the distribution of minimal project time under these assumptions. In this paper, a “here-and-now” formulation is proposed in which the manager takes a risk by fixing the project event times before the job durations are known; based on the allotted time interval, and the actual duration of the job, additional effort may have to be expended to stay on schedule. Under general assumptions, it is shown that minimizing the average total additional effort needed to stay on schedule will result in a cost-time scheduling problem of the CPM type.
불러오는 중…
- Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities
- Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions
- Better Estimation of PERT Activity Time Parameters
- A Statistical Theory for PERT Critical Path Analysis
- On the Expected Duration of PERT Type Networks
- Bias in Pert Project Completion Time Calculations for a Real Network
- A Minimum Risk Manpower Scheduling Technique
- Total Cost Control in Project Management via Satisficing
- A Statistical Theory for Pert in Which Completion Times of Activities are Inter-Dependent
- Dynamic Programming Models of the Nonserial Critical Path-Cost Problem
- A Network Flow Computation for Project Cost Curves
- Decomposition of Project Networks
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 11(3) · 438–443
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.11.3.438
- 저자William S. Jewell