58
피인용
3.3
FWCI
2
IS/마케팅/OM 탑저널 피인용
4
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
Previous work dealt with the problems of nervousness in Material Requirements Planning (MRP) Systems when production schedules were modified to include setups which previously had not been scheduled. In this work we further examine nervousness and its cost. By modifying the setup costs used in the Wagner-Whitin algorithm, we develop a generalized solution methodology for dealing with situations in which new setups are added to the production schedule and existing setups are cancelled.
02연구 흐름
불러오는 중…
03비슷한 논문
- Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach
- A Comparison of Strategies to Dampen Nervousness in MRP Systems
- Optimal Multi-Level Lot Sizing for Requirements Planning Systems
- Material Requirements Planning Under Demand Uncertainty Using Stochastic Optimization
- Note—On MRP Lot Sizing
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- Safety Stocks in MRP—Systems with Emergency Setups for Components
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- MRP Planned Orders in a Multiple‐Supplier Environment with Differing Lead Times
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 30(2) · 240–244
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.30.2.240
- 저자Dean H. Kropp, Robert Carlson