01Abstract
Most of the procedures that have been developed to find solutions to the single-machine, multi-product lot scheduling problem depend on judgment to define the desirable frequencies of production for the products. In this paper we describe an iterative procedure for directly determining near optimal frequencies of production for the products and the associated fundamental cycle time which, in many cases, can be used directly for constructing production schedules. In cases where feasible schedules cannot be constructed using the values from the iterative procedure, the procedure provides a basis for changing the production frequencies and the fundamental cycle time to obtain feasible schedules.
02연구 흐름
불러오는 중…
03비슷한 논문
- Note—A Note on the Single-Machine Multi-Product Lot Scheduling Problem
- Feasibility of Scheduling Lot Sizes of Three Products on One Machine
- On the Feasibility of Scheduling Lot Sizes for Two Products on One Machine
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
- Scheduling a Multi-Product Single Machine System for an Infinite Planning Period
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Economic Lot Scheduling for Multiple Products on Parallel Identical Processors
- A Generalized Lagrange Multiplier Algorithm for Optimum or Near Optimum Production Scheduling
- Lot Size Scheduling on a Single Machine for Stochastic Demand
04이후 연구
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- A Simple Method of Determining Order Quantities in Joint Replenishments Under Deterministic Demand
- Note—A Note on the Single-Machine Multi-Product Lot Scheduling Problem
- Lot Sizing and Sequencing for N Products on One Facility
- Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems
- On the Feasibility of Scheduling Lot Sizes for Two Products on One Machine
- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
- Note—On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem
- Production Runs for Multiple Products: The Two-Product Heuristic
- Economic Lot Scheduling for Multiple Products on Parallel Identical Processors
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
- Smart Markets for Real-Time Allocation of Multiproduct Resources: The Case of Shared Electric Vehicles
- Scheduling Economic Lot Size Production Runs
05선행 연구
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- Scheduling a Multi-Product Single Machine System for an Infinite Planning Period
- A Computational Approach to the Economic Lot Scheduling Problem
- Note—On Madigan's Approach to the Deterministic Multi-Product Production and Inventory Problem
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 20(1) · 50–55
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.20.1.50
- 저자Charles Loren Doll, D. Clay Whybark