A number of jobs have to be carried out on a gas transmission network every year, which restrict the transmission capacity of the network while they are in progress. There are certain pairs of jobs which must not be in progress at the same time. The network must meet a convex annual demand pattern. The problem of scheduling the jobs over the summer construction period to meet these conditions is formulated as a mixed-integer linear programming problem which is solved by a branch-and-bound algorithm. Results and benefits to the operators of the network are described.
02연구 흐름
불러오는 중…
03비슷한 논문
- Scheduling of Project Networks by Job Assignment
- The Gas Transmission Problem Solved by an Extension of the Simplex Algorithm
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- A Machine-Job Scheduling Model
- A Network Approach to a Multi-Facility, Multi-Product Production Scheduling Problem Without Backordering
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques
- The Truck Dispatching Problem
- Optimum Time Compression in Project Scheduling
- Investment-Borrowing Decisions in Natural Gas Transmission
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
06서지 정보
- 저널Management Science · 25(1) · 98–104
- 토픽Integrated Energy Systems Optimization · Electrical and Electronic Engineering
- DOI10.1287/mnsc.25.1.98
- 저자George Jones, J. G. Wilson