Optimal Scheduling of Jobs on a Transmission Network
Management Science
5
피인용
0.6
FWCI
0
IS/마케팅/OM 탑저널 피인용
0
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
A number of jobs have to be carried out on a gas transmission network every year, which restrict the transmission capacity of the network while they are in progress. There are certain pairs of jobs which must not be in progress at the same time. The network must meet a convex annual demand pattern. The problem of scheduling the jobs over the summer construction period to meet these conditions is formulated as a mixed-integer linear programming problem which is solved by a branch-and-bound algorithm. Results and benefits to the operators of the network are described.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 25(1) · 98–104
- 토픽Integrated Energy Systems Optimization · Electrical and Electronic Engineering
- DOI10.1287/mnsc.25.1.98
- 저자George Jones, J. G. Wilson