ms·1970년 9월 1일
A Simple Optimality Proof of Moore's Sequencing Algorithm
Management Science
29
피인용
6.2
FWCI
1
IS/마케팅/OM 탑저널 피인용
2
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
In a recent article J. M. Moore [Moore, J. M. 1968. An n job, one machine sequencing algorithm for minimizing the number of late jobs. Management Sci. 14(1, September) 102–109.] gave an algorithm for minimizing the number of late jobs in a one machine sequencing problem. As indicated by the author, T. J. Hodgson has proposed a simpler version of this algorithm, for which version the proof of optimality is similar to the proof given by the author for the original algorithm. In this note a simpler proof of optimality, based on the inductive principle, will be presented for Hodgson's algorithm. As Moore's algorithm only differs on minor points, this proof covers it as well.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 17(1) · 116–118
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.17.1.116
- 저자L. B. J. M. Sturm