ms·1977년 2월 1일
Note—A Note on Shwimer's Theorem A
Werner Dinkelbach, Otto Rosenberg
Management Science
3
피인용
0.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
In 1972 Joel Shwimer published some interesting research “on the n-job, one-machine, sequence-independent scheduling problem with tardiness penalties … where the goal is to minimize the total penalty costs resulting from the tardiness of the jobs” (Shwimer, J. 1972. On the n-job, one-machine, sequence-independent scheduling problem with tardiness penalties: a branch-bound solution. Management Sci. 18 (6) B-301–B313.). The proposed algorithm is essentially based on his Theorem A. Unfortunately the given proof of Theorem A contains an inconsistency. In this note we present a different proof of the mentioned theorem.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 23(6) · 660–661
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.23.6.660
- 저자Werner Dinkelbach, Otto Rosenberg