01Abstract
This paper surveys methods proposed in the literature for determining the optimal solution to “N Job, M Machines” scheduling problems when there are no due dates or priorities and the sole objective is to complete all operations in least time.
02연구 흐름
불러오는 중…
03비슷한 논문
- Note—Sequencing <i>n</i> Jobs on <i>m</i> Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- <i>N</i>-Job, One Machine Sequencing Problems Under Uncertainty
- A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem
- An Algorithm for Solving Job Sequencing Problems
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- On Sequencing <i>n</i> Jobs on One Machine to Minimize the Number of Late Jobs
- A Greedy Heuristic for Single Machine Sequencing with Precedence Constraints
- The Single Machine Problem with a Quadratic Cost Function of Completion Times
- A Sequencing Problem with Release Dates and Clustered Jobs
- Minimising Waiting Time Variance in the Single Machine Problem
04이후 연구
05선행 연구
15 / 21편
- Simulation of a Simplified Job Shop
- An Algorithm for the Construction and Evaluation of Feasible Schedules
- A Machine-Job Scheduling Model
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 16(4) · B–247
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.16.4.b247
- 저자Mahendra S. Bakshi, Sant Arora