01Abstract
This paper defines a model that covers the multimachine extensions of all existing flow-shop problems with time lags as well as flow-shop problems where setup, processing and release times are separated. Approximate solutions and lower completion time bounds are developed for the restricted and unrestricted cases.
02연구 흐름
불러오는 중…
03비슷한 논문
- Job Shop Sequencing Problem on Two Machines with Time Lag Constraints
- Sequencing Two-Machine Flow-Shops with Finite Intermediate Storage
- Flowshop Sequencing Problem with Ordered Processing Time Matrices
- Focused Scheduling in Proportionate Flowshops
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- A Note on Stochastic Shop Models in Which Jobs have the Same Processing Requirements on Each Machine
- Even-Flow, A Scheduling Method for Reducing Lateness in Job Shops
- Batching to Minimize Flow Times on Parallel Heterogeneous Machines
- Flow Shop Scheduling with Partial Resource Flexibility
- A Broader View of the Job-Shop Scheduling Problem
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
- Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- Discussion: Sequencing n Jobs on Two Machines with Arbitrary Time Lags
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 29(4) · 477–481
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.29.4.477
- 저자Włodzimierz Szwarc