- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
The problem studied is that of two-machine job shop sequencing where some jobs are processed first on machine 1 and then on machine 2, while the remaining jobs are processed in the reverse order. The objective is to determine an ordered sequence which minimizes the total processing time, subject to some specified lag time constraints. A rule is given for determining two different sequences for the two machines which represent an optimal solution.
02연구 흐름
불러오는 중…
03비슷한 논문
- Sequencing <i>n</i> Jobs on Two Machines with Arbitrary Time Lags
- Discussion: Sequencing <i>n</i> Jobs on Two Machines with Arbitrary Time Lags
- Sequencing Two-Machine Flow-Shops with Finite Intermediate Storage
- A Heuristic Procedure for Parallel Sequencing with Choice of Machines
- Flowshop Sequencing Problem with Ordered Processing Time Matrices
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- The Sequencing Problem
- A Broader View of the Job-Shop Scheduling Problem
- <i>N</i>-Job, One Machine Sequencing Problems Under Uncertainty
- Note—Sequencing <i>n</i> Jobs on <i>m</i> Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
06서지 정보
- 저널Management Science · 19(9) · 1063–1066
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.19.9.1063
- 저자Shrikant S. Panwalkar