Sequencing <i>n</i> Jobs on Two Machines with Arbitrary Time Lags
Management Science
143
피인용
5.6
FWCI
4
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
Each of n jobs must be run first on machine I and then on machine I. Running times for each job on each machine are given. Also specified are arbitrary time lags which prescribe that a job may not be started (completed) on machine II until at least a certain time has elapsed since starting (completing) the job on machine I. A rule is given for determining the sequence in which jobs are to be run on the machines—using the same sequence for both machines—in order to minimize the time between the start of production of the first job on machine I and the completion of production of the last job on machine II.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 5(3) · 293–298
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.5.3.293
- 저자L. G. Mitten