ms·1978년 2월 1일
The Economic Lot Scheduling Problem (ELSP): Review and Extensions
Management Science
559
피인용
23.9
FWCI
18
IS/마케팅/OM 탑저널 피인용
20
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
The ELSP is a time-honored problem that “has been around” since 1915. It is the problem of accommodating cyclical production patterns when several products are made on a single facility. Recent contributions to its resolution resulted in either analytical approaches to a restricted problem, or heuristic approaches to the entire problem. This paper reviews critically the various contributions to the problem, and extends the analysis in the following four directions: An improved analytical approach A test for feasibility, A systematic means for escape from infeasibility, and A procedure for the determination of a basic period for a given set of multipliers to achieve a feasible schedule.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 24(6) · 587–598
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.24.6.587
- 저자Salah E. Elmaghraby