Open Order Due Date Maintenance in MRP Systems
Richard J. Penlesky, William L. Berry, Urban Wemmerlöv
인용
- 주제생산 계획과 일정 · 생산·최적화
This paper is concerned with the problem of maintaining open order due dates in job shops that plan and schedule their operations using Material Requirements Planning (MRP) methodology. Two different techniques for dealing with open order due date changes are analyzed using customer service level and total inventory level performance measures. With the first technique, called the fixed due date approach, due dates are never changed from those originally assigned to orders when released to the shop. With the second technique, called the dynamic due date approach, all due dates are updated to reflect actual need dates. Beyond evaluating them in an MRP context, this study extends current understanding of these two techniques by observing them in a variety of different operating environments. The results of the study indicate that: (1) the dynamic due date approach performs as good as, or better than, the fixed due date approach across a wide range of operating conditions; and (2) operating conditions have an important effect on the magnitude of the performance differential between the two approaches.
불러오는 중…
- Due Date Assignment for Production Systems
- The Effect of Workload Dependent Due-Dates on Job Shop Performance
- MRP Planned Orders in a Multiple‐Supplier Environment with Differing Lead Times
- Due-Dates and Instantaneous Load in the One-Machine Shop
- A Simulation Study of Predictable Due-Dates
- Alternative Formulation of the Job Shop Problem with Due Dates
- Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
- A Methodology for Assigning Minimum Cost Due-Dates
- Sequencing Rules and Due-Date Assignments in a Job Shop
- A Broader View of the Job-Shop Scheduling Problem
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- Kanban, MRP, and Shaping the Manufacturing Environment
- Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach
- On the Effectiveness of Common Random Numbers
- Critical Ratio Scheduling: An Experimental Analysis
- Note—A Note on “Critical Ratio Scheduling: An Experimental Analysis”
- Priority Scheduling Rules for Repairable Inventory Systems
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 35(5) · 571–584
- 토픽Manufacturing Process and Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.35.5.571
- 저자Richard J. Penlesky, William L. Berry, Urban Wemmerlöv