It is shown how Lawler's procedure for the one-machine case can be combined with Johnson's rule to produce a branch-and-bound algorithm for the two-machine version.
02연구 흐름
불러오는 중…
03비슷한 논문
- Sequencing Two-Machine Flow-Shops with Finite Intermediate Storage
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- A Comment on a Paper of Maxwell
- Batching to Minimize Flow Times on One Machine
- An Algorithm for Solving the Job-Shop Problem
- Note—Sequencing with Finite Intermediate Storage
- The Labor Assignment Decision and Application of Work Flow Structure Information
- The Single Machine Problem with Quadratic Penalty Function of Completion Times: A Branch-and-Bound Solution
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 24(2) · 230–234
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.24.2.230
- 저자W. Townsend