Job Shop Scheduling with Due Dates and Variable Processing Times
Charles A. Holloway, Rosser T. Nelson
Management Science
- 주제작업장 일정 최적화 · 생산·최적화
A multi-pass heuristic scheduling procedure developed for job scheduling problems with deterministic processing times is tested with processing times that are random variables. The heuristic procedure, which uses expected processing times, typically generates a delay schedule (i.e., a schedule in which some operations are delayed while the machine to process these operations is kept idle awaiting the arrival of another operation). Simulation is employed to compare the performance of the schedule generated by the heuristic procedure, a nondelay transformation of that schedule, and the nondelay schedules obtained with four single-pass dispatching rules. The criteria employed are fraction of jobs tardy, mean tardiness, variance of tardiness, and maximum tardiness. The delay schedule produced by the heuristic procedure was found to be markedly superior under certain conditions. Under other conditions, the relative performance of the scheduling rules appears highly problem dependent. Implications of these results are discussed with respect to further research.
불러오는 중…
불러오는 중…
불러오는 중…
불러오는 중…
- 저널Management Science · 20(9) · 1264–1275
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.20.9.1264
- 저자Charles A. Holloway, Rosser T. Nelson