This paper describes a simulation study of assigning attainable or predictable due-dates in hypothetical labor and machine constrained job shop settings of varying size and structure. Several predictable due-date assignment rules are developed based on conditional estimates of individual job flow time derived from initial simulation runs. Mean lateness, mean earliness and mean missed due-dates are used as measures of shop performance to compare the various predictable due-date rules under conditions of varying dispatching rules and shop size and structure. Results indicate that due-dates assigned based on expected job flow time and shop congestion information may provide more attainable due-dates than rules based solely upon job characteristics. In addition, better due-date performance appears to be achieved when due-date oriented dispatching rules are employed and when the shop system is not structurally complex.
불러오는 중…
- Sequencing Rules and Due-Date Assignments in a Job Shop
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- A Methodology for Assigning Minimum Cost Due-Dates
- The Effect of Workload Dependent Due-Dates on Job Shop Performance
- Due Date Assignment for Production Systems
- Note. Satisfying Due Dates in Large Job Shops
- Due-Dates and Instantaneous Load in the One-Machine Shop
- Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
- Job Shop Scheduling with Due Dates and Variable Processing Times
- Priority Rules for Job Shops with Weighted Tardiness Costs
- Sequencing Rules and Due-Date Assignments in a Job Shop
- Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue
- The Effect of Workload Dependent Due-Dates on Job Shop Performance
- A Broader View of the Job-Shop Scheduling Problem
- Due Date Assignment for Production Systems
- Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues
- Optimal Lead Time Policies
- Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
- Labor and Machine Limited Production Systems
- Simulation of a Simplified Job Shop
- Operating Policies in Multiechelon Dual-Constraint Job Shops
- A Simulation of Labor Efficiency and Centralized Assignment in a Production Model
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- A Methodology for Assigning Minimum Cost Due-Dates
- Effects of Shop Size and Labor Flexibility in Labor and Machine Limited Production Systems
- Labor Flexibility in Multiechelon Dual-Constraint Job Shops
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 25(4) · 363–373
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.25.4.363
- 저자James K. Weeks