Alternative Formulation of the Job Shop Problem with Due Dates
Charles A. Holloway, Rosser T. Nelson
Management Science
- 주제작업장 일정 최적화 · 생산·최적화
The classical formulation of the static job shop scheduling problem with job due dates implies that the question of interest to the manager is: What is the best that can be done to meet due dates with fixed resources? Here, two alternative formulations of the problem are proposed; one because of its practical appeal, the other because of its methodological appeal. The latter is used to develop a multi-pass heuristic scheduling procedure aimed at providing a practical tool for attacking any of the three formulations of the problem. This paper describes the basic structure of the scheduling procedure, the machine coding of a specific version of the procedure, and computational experience with a set of test problems ranging in size up to fourteen jobs and seven machines.
불러오는 중…
불러오는 중…
불러오는 중…
불러오는 중…
- 저널Management Science · 20(1) · 65–75
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.20.1.65
- 저자Charles A. Holloway, Rosser T. Nelson