Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
Steve Phillips, Mohamed I. Dessouky
인용
103
피인용
1.5
FWCI
3
IS/마케팅/OM 탑저널 피인용
7
IS/마케팅/OM 탑저널 참고문헌
- 주제네트워크 흐름 최적화 · 생산·최적화
01Abstract
This paper introduces a solution procedure for solving the project time/cost tradeoff problem of reducing a project duration at a minimum cost. The solution to the time/cost problem is achieved by locating a minimal cut in a flow network derived from the original project network. This minimal cut is then utilized to identify the project activities which should experience a duration modification in order to achieve the total project reduction. The paper will document this cut-based procedure and provide a practical application to a project situation.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Dynamic Programming Solution to Cost-Time Tradeoff for CPM
- A Simple CPM Time-Cost Tradeoff Algorithm
- Solving Project Scheduling Problems by Minimum Cut Computations
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- A Network Flow Computation for Project Cost Curves
- The Cut Search Algorithm with Arc Capacities and Lower Bounds
- Minimal Cost Cut Equivalent Networks
- A Branch and Bound Algorithm for Minimizing Cost in Project Scheduling
- An Efficient Minimal Cost Flow Algorithm
- Minimizing Resource Availability Costs in Time-Limited Project Networks
04이후 연구
05선행 연구
- A Network Flow Computation for Project Cost Curves
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 24(4) · 393–400
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.24.4.393
- 저자Steve Phillips, Mohamed I. Dessouky