A Branch and Bound Algorithm for Minimizing Cost in Project Scheduling
A. Thomas Mason, Colin L. Moodie
인용
- 주제작업장 일정 최적화 · 생산·최적화
This paper presents a “branch and bound” algorithm for the following problem: given a project consisting of a set of activities partially ordered by a set of precedence restrictions, with each activity having a fixed resource requirement over a specified duration, find that set of activity start times which minimizes the combined cost of fluctuations in resource demand and delay of project completion. Cost bounding procedures are augmented by dominance relationships presented as theorems. Initial feasible schedules are generated using a heuristic scheduling rule. Both the heuristic rule and the branch and bound algorithm have been programmed for the computer. Results indicate that while computation time is related to the project network structure, more significant factors are the number of activities and the relative values of the activity parameters, duration and resource requirement. Also, results indicate that the optimal schedule is relatively insensitive to changes in the ratio of the project completion delay cost to the resource level fluctuation cost. Finally, the imposition of an upper limit on resource availability resulted, in most cases, in an increase in the duration and cost of the optimal solution.
불러오는 중…
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- Solving Project Scheduling Problems by Minimum Cut Computations
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- Minimizing Resource Availability Costs in Time-Limited Project Networks
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
- 저널Management Science · 18(4-part-i) · B–158
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.18.4.b158
- 저자A. Thomas Mason, Colin L. Moodie