21
피인용
0.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
4
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
It is shown that Lawler's efficient (order n2) algorithm for the n-job, one-machine scheduling problem (where the objective is to minimize the maximum deferral cost subject to arbitrary precedence relationships) also applies when the processing times are random variables and the objective is to minimize the maximum expected deferral cost. Several special cases are explored.
02연구 흐름
불러오는 중…
03비슷한 논문
- <i>N</i>-Job, One Machine Sequencing Problems Under Uncertainty
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Minimizing Single-Machine Completion Time Variance
- Minimising Waiting Time Variance in the Single Machine Problem
- Scheduling to Minimize the Number of Late Jobs When Set-Up and Processing Times are Uncertain
- Algoristics for Single-Machine Sequencing with Precedence Constraints
- Scheduling Jobs with Exponentially Distributed Processing Times on Two Machines with Resource Constraints
- The Sequencing Problem
- On the <i>N</i>-Job One-Machine, Sequence-Independent Scheduling Problem with Tardiness Penalties: A Branch-Bound Solution
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 23(10) · 1144–1146
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.23.10.1144
- 저자Thom J. Hodgson