IS Atlas
ms·1999년 2월 1일

Optimal Lead Time Policies

M Leroy Spearman, Rachel Q. Zhang

Management Science

88
피인용
12.0
FWCI
3
IS/마케팅/OM 탑저널 피인용
18
IS/마케팅/OM 탑저널 참고문헌
01Abstract

This paper examines two due-date setting problems first studied by Wein (1991). The first problem seeks to minimize the average due-date lead time (due-date minus arrival date) of jobs subject to a constraint on the fraction of tardy jobs (Problem I) while the second uses the same objective subject to a constraint on average job tardiness (Problem II). We show that under very general conditions, Problem I leads to unethical practice (i.e., quote lead times for which there is no hope to achieve when the system is highly congested) while Problem II results in policies that quote lead times that are monotonically increasing with the congestion level. Furthermore, we prove that Problem II is equivalent to a policy that is widely used and is easy to compute. This policy quotes lead times that guarantee the same serviceability level (the fraction of tardy jobs) to all jobs.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보