Due-Dates and Instantaneous Load in the One-Machine Shop
Management Science
- 주제작업장 일정 최적화 · 생산·최적화
The due-date assignment problem occurs when due-dates are assigned within, rather than outside, a job shop. This study explores the importance of instantaneous and future shop loads in setting due-dates in shops operating under due-date dependent queue discipline. The assignment of due-dates to arriving jobs in an m-machine shop is formulated as a stochastic dynamic programming problem in the first part of this study. A computational experiment using dynamic programming is performed in the second part and due-dates are developed for specific instantaneous load conditions in a simulated one-machine shop. The importance of instantaneous and future shop loads for assigning due-dates in a one-machine shop, with constant interarrivals and exponential service times, is shown.
불러오는 중…
불러오는 중…
불러오는 중…
불러오는 중…
- 저널Management Science · 23(4) · 444–450
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.23.4.444
- 저자Edwin L. Heard