The due-date assignment problem occurs when due-dates are assigned within, rather than outside, a job shop. This study explores the importance of instantaneous and future shop loads in setting due-dates in shops operating under due-date dependent queue discipline. The assignment of due-dates to arriving jobs in an m-machine shop is formulated as a stochastic dynamic programming problem in the first part of this study. A computational experiment using dynamic programming is performed in the second part and due-dates are developed for specific instantaneous load conditions in a simulated one-machine shop. The importance of instantaneous and future shop loads for assigning due-dates in a one-machine shop, with constant interarrivals and exponential service times, is shown.
불러오는 중…
- The Effect of Workload Dependent Due-Dates on Job Shop Performance
- Due Date Assignment for Production Systems
- A Broader View of the Job-Shop Scheduling Problem
- Alternative Formulation of the Job Shop Problem with Due Dates
- A Simulation Study of Predictable Due-Dates
- Note. Satisfying Due Dates in Large Job Shops
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- A Dynamic Model for the Optimal Loading of Linear Multi-Operation Shops
- A Methodology for Assigning Minimum Cost Due-Dates
- Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 23(4) · 444–450
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.23.4.444
- 저자Edwin L. Heard