Comments on the Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
인용
1
피인용
0.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
One of the necessary and sufficient conditions derived by F. F. Boctor (1982) for feasibility of a repetitive two-product schedule is that the cycle times (T1 and T2) must be integer multiples of some time interval T (Propositions 2, 3 and 4). This result also holds for N-product schedules. However, the proof for Propositions 3 and 4 in [1] is not exactly valid and therefore a correction has to be made.
02연구 흐름
불러오는 중…
03비슷한 논문
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
- On the Feasibility of Scheduling Lot Sizes for Two Products on One Machine
- Note—On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem
- Feasibility of Scheduling Lot Sizes of Three Products on One Machine
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- Note—A Note on the Single-Machine Multi-Product Lot Scheduling Problem
- Lot Size Scheduling on a Single Machine for Stochastic Demand
- Scheduling a Multi-Product Single Machine System for an Infinite Planning Period
- Economic Order Quantities and Multiple Set-Up Costs
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
06서지 정보
- 저널Management Science · 39(3) · 387–388
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.39.3.387
- 저자Shaoxiang Chen