Project Scheduling Under Partially Renewable Resource Constraints

Jan Böttcher, Andreas Drexl, Rainer Kolisch, Frank Salewski

Management Science

94
피인용
5.8
FWCI
0
IS/마케팅/OM 탑저널 피인용
41
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially renewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make, e.g., timetabling and shift scheduling aspects, amenable to project scheduling. In addition, partially renewable resources serve to model complicated labor regulations. Furthermore, they cover traditional renewable and nonrenewable resource constraints as special cases. We consider makespan minimization as objective. For the exact solution of the problem we employ a basic enumeration scheme. In order to speed up convergence, we formulate bounds which take into account future resource consumption of partially renewable resources. Moreover, we generalize the serial scheduling scheme in order to get fast approximation methods. A rigorous assessment of the procedures is provided by solving ProGen instances generated under a full factorial test design. Besides the well-known problem parameters we employ additionally three parameters which control the generation of partially renewable resources.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보