Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements

Arno Sprecher

Management Science

104
피인용
5.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
17
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We consider the resource-constrained project scheduling problem. The purpose of this paper is to direct the focus to a branch-and-bound concept that can, by simple adaptations, operate on a wide range of problem settings. The general approach can, e.g., deal with multimode problems, resource availability varying with time, and a wide range of objectives. Even the simple assembly line balancing problem of type-1 can be competitively approached with some modifications. Although the algorithm is the most general and simple one currently available for resource-constrained project scheduling, the computational performance can compete with the best approaches available for the single-mode problem. The algorithm uses far less memory than the state-of-the-art procedure, i.e., 256 KB versus 24 MB, for solving the standard benchmark set with projects consisting of 32 activities within comparable time. If both approaches are allowed to make limited use of memory, i.e., 256 KB, then more than 97% of the benchmark instances can be solved within fractions of the time required by the current state-of-the-art procedure. The truncated version of our algorithm achieves at 256 KB approximately the results of the truncated version of the state-of-the-art approach at 24 MB. Since in general the memory requirements exponentially grow with the number of activities the project consists of, memory will become a critical resource, and the strategy to access previously stored information will gain fundamental importance when solving larger projects.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보