Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
Rainer Kolisch, Arno Sprecher, Andreas Drexl
인용
- 주제작업장 일정 최적화 · 생산·최적화
This paper addresses the issue of how to generate problem instances of controlled difficulty. It focuses on precedence- and resource-constrained (project) scheduling problems, but similar ideas may be applied to other network optimization problems. It describes a network construction procedure that takes into account a) constraints on the network topology, b) a resource factor that reflects the density of the coefficient matrix, and c) a resource strength, which measures the availability of resources. The strong impact of the chosen parametric characterization of the problems is shown via an in depth computational study. Instances for the single- and multi-mode resource-constrained project scheduling problem are benchmarked by using the state of the art (branch and bound) procedures. The results provided, demonstrate that the classical benchmark instances used by several researchers over decades belong to the subset of the very easy ones. In addition, it is shown that hard instances, being far more smaller in size than presumed in the literature, may not be solved to optimality even within a large amount of computation time.
불러오는 중…
- Project Scheduling Under Partially Renewable Resource Constraints
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
- Solving Project Scheduling Problems by Minimum Cut Computations
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Ex‐Post Funding: How Should a Resource‐Constrained Non‐Profit Organization Allocate Its Funds?
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
- Project Scheduling Under Partially Renewable Resource Constraints
15 / 22편
- Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Scheduling of Project Networks by Job Assignment
- Coefficient of Network Complexity
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 41(10) · 1693–1703
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.41.10.1693
- 저자Rainer Kolisch, Arno Sprecher, Andreas Drexl