A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
인용
- 주제작업장 일정 최적화 · 생산·최적화
A recurring problem in managing project activity involves the allocation of scarce resources to the individual activities comprising the project Resource conflict resolution decisions must be made whenever the concurrent demand for resources by the competing activities of a project exceeds resource availability. When these resource conflict resolution decisions arise, project managers seek direction on which activities to schedule and which to delay in order that the resulting increase in project duration is the minimum that can be achieved with the given resource availabilities. The procedures examined in this paper are all designed to provide for this type of decision support. Each procedure examined is enumerative based, methodically searching the set of possible solutions in such a way that not all possibilities need be considered individually. The methods differ in the manner in which the tree representing partial schedules is generated and is saved, and differ in the methods which are used to identify and discard inferior partial schedules. Each procedure was found to be generally superior on a specific class of problems, and these classes are identified.
불러오는 중…
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- Comparison of a Multi-Pass Heuristic Decomposition Procedure with Other Resource-Constrained Project Scheduling Procedures
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Project Scheduling with Continuously-Divisible, Doubly Constrained Resources
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- A Comparative Evaluation of Heuristic Line Balancing Techniques
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions
- Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths
- Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
15 / 20편
- An Algorithm for the Line Balancing Problem
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- A Horizon-Varying, Zero-One Approach to Project Scheduling
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 30(7) · 854–867
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.30.7.854
- 저자James Herbert Patterson