Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
John Dumond, Vincent A. Mabert
인용
- 주제작업장 일정 최적화 · 생산·최적화
Managers of construction projects, maintenance activities, auditing contracts, software shops, etc. are frequently faced with the task of establishing a new project's due date, which must compete with other projects already in progress or expected (forecasted) to start in the future. The study reported here addresses the problem of establishing due dates for projects which require limited resources, in an environment where new projects arrive continuously and randomly over time. A set of procedures is developed which set each project's due date when it arrives using information about the new project, current projects, and available resources. The due date setting procedures are tested via simulation with four activity scheduling heuristics that control the assignment of resources to specific activities of available projects. A second test demonstrates the performance of the due date procedures, where a portion of arriving projects have their due dates established by external forces beyond management's control. Performance measures of project mean completion time, project mean lateness, project standard deviation of lateness, and total tardiness (sum of all projects' tardy time) were collected for evaluation. This study presents a number of important results for managers interested in scheduling projects and setting due dates. First, using more information concerning the current work in progress, available resources, and activity precedent relationships provides a better due date estimate for a new project. Second, a finite scheduling procedure (called SFT) consistently gives better due date estimates than simpler aggregate procedures. Third, when some project due dates are set externally, due date performance deteriorates. However, when SFT is combined with a due date oriented activity scheduling rule, due dale performance deterioration is less. Fourth, the effort, measured by CPU time, for SFT to estimate a good due date depends upon the ratio of activity resources required to total resources available, rather than the number of activities across all projects. And fifth, similarities and differences between the results observed in this study and past due date job shop scheduling research are reviewed.
불러오는 중…
- A Simulation Study of Predictable Due-Dates
- The Effect of Workload Dependent Due-Dates on Job Shop Performance
- Sequencing Rules and Due-Date Assignments in a Job Shop
- Due Date Assignment for Production Systems
- A Methodology for Assigning Minimum Cost Due-Dates
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Job Shop Scheduling with Due Dates and Variable Processing Times
- Alternative Formulation of the Job Shop Problem with Due Dates
- A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
아직 이 논문을 인용한 탑저널 논문이 없습니다.
15 / 27편
- Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
- A Simulation Study of Predictable Due-Dates
- A Horizon-Varying, Zero-One Approach to Project Scheduling
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A Heuristic Model for Scheduling Large Projects with Limited Resources
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- Heuristic Scheduling of Activities under Resource and Precedence Restrictions
- A Branch and Bound Algorithm for Minimizing Cost in Project Scheduling
- 탑저널 밖 논문
- 저널Management Science · 34(1) · 101–118
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.34.1.101
- 저자John Dumond, Vincent A. Mabert