Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
인용
- 주제작업장 일정 최적화 · 생산·최적화
This paper considers the project scheduling problem with multiple constrained resources. Two classes of heuristic procedure, both making use of priority rules, are discussed: the parallel method, which generates just one schedule; and the sampling method, which generates a set of schedules using probabilistic techniques and selects the best schedule from this sample. An experimental investigation is described in which a set of projects with different characteristics is scheduled by each of these heuristics with a variety of priority rules. The effects of the heuristic method, the project characteristics and the priority rules are assessed. It is shown that the choice of priority rule is important with the parallel method, but with the sampling method, although it does affect the distribution of the sample, the choice of rule is not significant. The sampling method with sample size 100 is shown to produce samples at least 7% better than those generated by the corresponding parallel method, with 99% confidence. Further results are discussed and conclusions are presented.
불러오는 중…
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- Multi-Project Scheduling: Categorization of Heuristic Rules Performance
- A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions
- A Heuristic Model for Scheduling Large Projects with Limited Resources
- Comparison of a Multi-Pass Heuristic Decomposition Procedure with Other Resource-Constrained Project Scheduling Procedures
- Heuristic Scheduling of Activities under Resource and Precedence Restrictions
- A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- Project Scheduling Under Partially Renewable Resource Constraints
- Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
- An Experimental Investigation and Comparative Evaluation of Production Line Balancing Techniques
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 22(11) · 1186–1194
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.22.11.1186
- 저자Dale F. Cooper