- 주제작업장 일정 최적화 · 생산·최적화
This paper extends the field of heuristic algorithms for resource constrained scheduling problems in three important areas. First, an algorithm is introduced where the role of the heuristic scheduling urgency factor is expanded from one of solely determining the order in which activities are considered for scheduling at a given instant, to one of determining the combination of activities to be scheduled at this instant. Second, a new hybrid scheduling urgency factor capitalizing on the fact that this algorithm is sensitive to the absolute value rather than relative sequence of the urgency factors is introduced. Finally, a systematic approach to the evaluation of such algorithms is introduced. This includes the identification of relevant problem attributes and the adoption of evaluative concepts such as computational efficiency and analytic and systems effectiveness.
불러오는 중…
- Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation
- A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- A Heuristic Model for Scheduling Large Projects with Limited Resources
- Increasing Service Levels in Conference and Educational Scheduling: A Heuristic Approach
- A Greedy Heuristic for Single Machine Sequencing with Precedence Constraints
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- Heuristics in Job Shop Scheduling
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- Analytical Effectiveness of Mathematical Models for R&D Project Selection
- The Efficiency of Computer Algorithms for Plant Layout
- A Heuristic Model for Scheduling Large Projects with Limited Resources
- A Branch and Bound Algorithm for Minimizing Cost in Project Scheduling
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 23(4) · 412–422
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.23.4.412
- 저자Arne Thesen