Multi-Project Scheduling: Categorization of Heuristic Rules Performance
Ibrahim S. Kurtulus, Edward W. Davis
Management Science
- 주제작업장 일정 최적화 · 생산·최적화
Application of heuristic solution procedures to the practical problem of project scheduling has previously been studied by numerous researchers. However, there is little consensus about their findings, and the practicing manager is currently at a loss as to which scheduling rule to use. Furthermore, since no categorization process was developed, it is assumed that once a rule is selected it must be used throughout the whole project. This research breaks away from this tradition by providing a categorization process based on two powerful project summary measures. The first measure identifies the location of the peak of total resource requirements and the second measure identifies the rate of utilization of each resource type. The performance of the rules are classified according to values of these two measures, and it is shown that a rule introduced by this research performs significantly better on most categories of projects.
불러오는 중…
불러오는 중…
불러오는 중…
불러오는 중…
- 저널Management Science · 28(2) · 161–172
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.28.2.161
- 저자Ibrahim S. Kurtulus, Edward W. Davis