Multi-Project Scheduling: Categorization of Heuristic Rules Performance

Ibrahim S. Kurtulus, Edward W. Davis

Management Science

285
피인용
2.6
FWCI
4
IS/마케팅/OM 탑저널 피인용
11
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Application of heuristic solution procedures to the practical problem of project scheduling has previously been studied by numerous researchers. However, there is little consensus about their findings, and the practicing manager is currently at a loss as to which scheduling rule to use. Furthermore, since no categorization process was developed, it is assumed that once a rule is selected it must be used throughout the whole project. This research breaks away from this tradition by providing a categorization process based on two powerful project summary measures. The first measure identifies the location of the peak of total resource requirements and the second measure identifies the rate of utilization of each resource type. The performance of the rules are classified according to values of these two measures, and it is shown that a rule introduced by this research performs significantly better on most categories of projects.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보